226 - Cab No.1 - Other than Drivers Desk.
Cab No.1 on 03.01.09 - parts removed from driver desk as work starts in earnest. 640x480 2226200901Ea.jpg 2009-01-03 18:15:00 |
Cab No.1 floor on 19.08.06 640x480 226200608A.jpg 2006-08-19 19:07:00 |
Cab No.1 floor on 26.08.06 after removing damaged area. 640x480 226200608Aa.jpg 2006-08-26 17:36:00 |
Cab No.1 Floor on 26.01.08 with Hole been welded but there is another on the other side of the cab awaiting attention. 640x480 226200801.jpg 2008-01-26 16:40:00 |
CabNo.1 Floor on 08.03.08 while still in need of overhaul a new wooden floor has been fitted. 640x480 226200803.jpg 2008-03-08 17:12:00 |
226 -on 27.09.08 - some wiring starting to appear in Cab No.1. - initially just to measure. 640x480 226200809A.jpg 2008-09-27 19:16:00 |
226 - on 03.01.09 - Floor supports for Cab No.1 cleaned, sanded and undercoated. 640x480 226200901E.jpg 2009-01-03 18:13:00 |
Cab No.1 Hooter Button on 14.02.09 after being wire brushed. 640x480 226200902D.jpg 2009-02-14 16:10:56 |
Cab No.1 Drop light inner frames on 14.02.09 after initial wirebrushing. 640x480 226200902E.jpg 2009-02-14 16:09:14 |
Cab No. 1 Floor supports woods on 14.02.09 removed for cleaning. 640x480 226200902F.jpg 2009-02-14 16:51:32 |
Cab No.1 wood support block on 14.02.09 after cleaning, wirebrushing and sanding wood primer applied. 720x960 226200902Fa.jpg 2009-02-14 17:48:22 |
Cab No.1 underfloor wooden supports undercoated on 21.02.09. 640x480 226200902Fb.jpg 2009-02-21 13:07:38 |
Cab No.1 underfloor supports on 28.02.09 top coated in Black (plus a few pipes from the drivers desk which were wire brushed and primed. 640x480 226200902Fc.jpg 2009-02-28 16:24:02 |
Cab No.1 under floor supports on 28.02.09 painted black and some pipes from the drivers desk wire brushed and primed. 640x480 226200902Fd.jpg 2009-02-28 16:24:16 |
Cab No.1 Floor on 14.02.09 with Hole on Right hand side - will need replacement patch. 640x480 226200902G.jpg 2009-02-14 18:35:26 |
Cab No.1 on 21.02.09 showing hole in floor and also in side wall. 480x640 226200902Ga.jpg 2009-02-21 18:11:45 |
General parts from Cab No.1 on 28.02.09 after wire brushing. 640x480 226200902H.jpg 2009-02-28 16:24:47 |
Various piece wirebrushed and primed on 07.03.09. 1280x960 226200903A.jpg 2009-03-07 14:59:22 |
Part of Cab No.1 Side Wall undercoated on 28.03.09. 640x480 226200903Aa.jpg 2009-03-28 15:54:00 |
Bare rear wall of Cab No.1 on 28.03.09 after removal of piping. 640x480 226200903B.jpg 2009-03-28 18:15:28 |
Piping removed from rear wall of Cab No.1 on 28.03.09. 640x480 226200903Ba.jpg 2009-03-28 18:15:53 |
More Pipes and Timber removed from Cab No.1 on 04.04.09. 640x480 226200904A.jpg 2009-04-04 17:33:14 |
Cab side panel and window on 04.04.09 undercoated. 640x480 226200904B.jpg 2009-04-04 14:46:00 |
Part of Cab window frame on 18.04.09 now painted. 960x1280 226200904Ba.jpg 2009-04-18 12:42:04 |
| | | |